Recent Improvements on the CrystalLine Hinge Door System

CrystalLine Frameless Hinge Magnet...Learn more >
CrystalLine Hinge Header Brackets...Learn more >
CrystalLine Frameless Hinge Drip Sweep...Learn more >
High-Strength Header for CrystalLine Hinge...Learn more >
 

CrystalLine Frameless Hinge Magnet

A new one-piece magnet will be introduced in early April. The new magnet is smaller, cleaner looking and less obtrusive than the old. It has also been designed to reduce the magnetic pull by about 25% to make the door easier to open.
 

CrystalLine Hinge Header Brackets

CrystalLine hinge header brackets have been redesigned to use four set screws to lock the header and threshold corners in place. The previously used screws allowed no room for corner re-adjustment and tightening. The new set screws allow for corner adjustment and will produce higher quality miter joints. The new brackets also have longer legs that will penetrate further into the header giving a more solid miter corner.

Production using the new brackets is expected in mid-March (the adjustable bracket will be in production in early July).

 

CrystalLine Frameless Hinge Drip Sweep

Newly designed U-channel drip sweeps will be introduced for CrystalLine frameless hinge doors in mid-to-late April. These new sweeps for 1/4" and 3/16" glass will greatly simplify sweep installation and, if a sweep is ever damaged, it can easily be replaced by the homeowner. The U-channel drip sweep will become the standard for CrystalLine frameless doors while the current "Stick-on" drip sweep will still be an available option.
 

High-Strength Header for CrystalLine Hinge

The SEJ 160 header, originally designed for Signature Pivot Door applications, will now be offered as an option for oversize CrystalLine hinge door applications. This header will give a stronger, more ridged structure for wider and taller CrystalLine installations.

Designed to be used with 1/4" glass, a new panel bead will be available in late April that will fit the panel firmly into the header. The header will accept all of the CrystalLine vertical extrusions and is provided with an SEJ 161 snap-in filler piece to finish off the top of the door opening.